Kemps Creek Resource Recovery Park
- Description Waste management facility
- Location Badgerys Creek
- Sector Industrial
- Sub-Sector Commercial, Environmental, Industrial, Storage
- Specialties New Build
- Contract Type Fixed Lump Sum
- Delivery Method Design and Construct
- Client SITA Environmental Solutions
- Architect Smith + Tracey
- Photographer SITA Environmental Solutions
The resource recovery facility at Badgerys Creek is helping families and neighbourhoods in Penrith and Liverpool make a real difference to the environment. By turning household waste into compost and recycled materials, the facility supports a circular economy.
The new facility processes over 134,000 tonnes of household waste each year, diverting up to 78% of waste from landfill. This dramatically reduces greenhouse gas emissions by approximately 75,000 tonnes of carbon dioxide equivalent annually, which is the equivalent of removing around 19,000 cars from Sydney’s roads. Green waste and food scraps are transformed into high-quality compost, supporting local parks, gardens, playing fields, and broader land rehabilitation, forestry, and agricultural projects. Metals, paper, plastics, and glass are also recovered and recycled, keeping valuable resources in circulation, rather than landfill.
The project was constructed on SITA’s existing 8-hectare site, with the new centre spanning 14,250m2 to house advanced waste processing equipment. The works consist of a positively pressured structure containing the waste sorting plant, internal concrete tunnel bays for waste composting, an attached control office, external hardstand, two external maturation pads for compost drying and a dam for collection of water for use in the composting process.

The structure was built with a steel frame, supported by concrete footings and beams, while concrete walls were used for external waste separation areas. The façade and roof featured durable steel cladding, designed for longevity and protection in an industrial environment. The building height was engineered to accommodate large machinery both fabricated locally and imported from France, with precision-cut openings allowing equipment to extend beyond the enclosure where required.
Inside, the facility includes a fully enclosed picking station, integrated office spaces, and an elevated walkway to ensure safe and secure movement for staff and visitors across operational zones. Along one side of the building, 12 large roller doors provide multiple entry points for vehicles to unload waste in a controlled, enclosed setting. Construction presented unique challenges, as SITA continued operating on-site throughout the build, and access routes were shared with the existing weighbridge. Close coordination between the Client, subcontractors, and the project team was critical to maintaining safety and ensuring smooth progress.