Government Facility

  • Description Offices, workshop and storage
  • Location Sydney
  • Sector Industrial
  • Sub-Sector Commercial, Industrial, Storage, Workplace
  • Specialties New Build
  • Contract Type Fixed Lump Sum
  • Delivery Method Construct Only
  • Client Landcom
  • Architect HBO+EMTB
  • Photographer Grindley
Download Profile

This highly sensitive government facility was designed and constructed with security, durability, and operational integrity as top priorities. Every detail, from structural systems to façade materials, was carefully considered to ensure the building meets stringent performance and safety requirements while presenting a modern, professional identity.

The architecture features clean, rectilinear forms and a bold colour palette, with vibrant orange panels contrasting against neutral grey and white tones. Horizontal glazing bands and integrated sun‑shading fins provide controlled daylighting and privacy, while vertical screens add depth and reinforce the secure nature of the building. A combination of smooth composite panels, ribbed metal sheeting, and pre‑cast concrete elements delivers both visual interest and long‑term resilience.

The facility is built on a robust steel frame with composite concrete floors, providing strength and adaptability for future operational needs. Profiled metal roofing offers lightweight durability, with services and penetrations seamlessly integrated to maintain the clean architectural expression. Consistent quality control and trade coordination supported a high‑performance, enduring finish.

6302 Police Facility 1 E1780268504536

The development spans across a substantial site and comprises 3 primary buildings supported by extensive car parking, hardstand areas, landscaped swales, and a dedicated security guardhouse. The predominant structure is a three‑storey administration building clad in pre‑cast concrete panels. The remaining 2 buildings, constructed from tilt‑up concrete panels, include a single‑storey workshop and administration areas, along with a 2,600 m² storage warehouse. Together, they form a secure, durable, and integrated operational precinct.

This project demonstrates how thoughtful planning, disciplined delivery, and strong architectural vision can produce a resilient government asset that supports long‑term operational needs and enhances service capability for the community.

Hear from our Industry Partners…