Calare Aged Care

  • Description Regional fire sprinkler upgrade
  • Location Orange
  • Sector Health and Care
  • Sub-Sector Aged Care
  • Specialties Remedial
  • Contract Type Fixed Lump Sum
  • Delivery Method Design and Construct
  • Client Allity
  • Photographer Grindley
Download Profile

The fire sprinkler upgrade at Calare Aged Care Orange reflects a long‑standing partnership built on trust, consistency and shared standards. Delivering the works in regional New South Wales demonstrates our commitment to supporting Clients wherever they need us, and ensuring their residents and staff remain safe, protected and compliant.

Working in a live aged‑care environment required careful planning and disciplined control of risk. Residents remained on site throughout the upgrade, so noise and disruption had to be tightly managed. Access was staged room‑by‑room, with clear communication to staff and daily coordination. Our safety approach focused on isolations, verification checks and conservative decision‑making.

The upgrade involved replacing and extending the existing sprinkler network to meet current fire safety standards. Works included new pipework runs, upgraded heads, penetrations through existing walls and ceilings, and integration with the facility’s fire detection and alarm systems. Materials were selected for durability and ease of maintenance, and all installations were pressure‑tested and independently certified before handover.

6344 Calara Fire Sprinkler Upgrade 8

The scope covered full sprinkler system upgrades across resident rooms, corridors and common areas, along with associated ceiling works, fire‑rated penetrations, service coordination and compliance documentation. This project demonstrates the strength of our relationship with Allity and the values we bring to every job, safety first, clear communication, disciplined planning and confidence in the finish. The result is a safer, compliant environment that supports residents and gives our Client certainty long after the work is complete.